REFERENCES

Güven Asphalt

REFERENCES

Image hover effect image

TOROSPORT CEYHAN

Bitumen Depot

As the operator of bitumen depots at Toros Ceyhan Terminal, one of the largest bulk and general cargo ports serving the İskenderun Gulf, Güven Asfalt is contributing to the region's vision of becoming a transit energy storage, management, and transit hub. Supported by a strong road and railway infrastructure, the terminal strengthens its growth potential in the future, alongside the increasing industrial and commercial investments in the surrounding settlements and cities. Therefore, the terminal operations sector holds significant potential for further growth in the coming period.

Image hover effect image

Solar Energy

Power Plant Project

We are pleased to take a new step with pride as Güven Asfalt in Çankırı, a city known for its natural beauty and energy potential. Our project to establish a modern Solar Power Plant with a 5022 Kilowatt production capacity is underway on a 53,428.61 square meter area, aiming to contribute to environmentally friendly and sustainable energy production. As a result of this significant step, we aim to prevent the emission of 3,351,317 kg of carbon dioxide. Additionally, the project aims to protect 505 trees and leave a healthy environment for future generations. This step, taken to contribute to clean and sustainable energy production through solar power, reflects our commitment to raising environmental awareness and supporting transformation in the energy sector.

Image hover effect image

North Marmara

HIGHWAY

The North Marmara Motorway, which connects the continents of Asia and Europe, is a high-standard, safe, quality, and uninterrupted transportation investment that will ease the transportation in the Marmara Region, home to the country's largest industrial areas. The 4-lane tunnels of the North Marmara Motorway are among the widest tunnels in the world. In the Marmara Region, which has the heaviest traffic in Turkey, it provides a comfortable and uninterrupted transit connection between Europe and Asia. It reduces travel time to 1.5 hours to Bursa, 2.5 hours to Eskişehir, and 3.5 hours to Ankara and İzmir from Istanbul.

Image hover effect image

ANKARA - NİĞDE

HIGHWAY

Ana güzergahı 277 km olan Ankara-Niğde Otoyolu'nun bağlantı yolları dahil toplam uzunluğu 332 km'dir.  Ana yolun  Ankara İlinden başlanan ilk 30 km’si 4x2 şeritli diğer km’leri ise 3x2 şeritli olarak dizayn edilmiştir.  Projenin kapsamında 5 Adet Viyadük(Toplam 3567 Metre). 34 Adet Kavşak köprüsü, 15 Adet Anayol Köprüsü, 73 Adet Ücret toplama Tesisi, 1 Ana Kontrol Merkezi, 2 Adet Bakım işletme Merkezi, 6 Adet Servis Alanı, 4 Adet Park Alanı yer almaktadır. Otoyol hepsi İç Anadolu bölgesinde yer alan Ankara, Aksaray, Konya, Kırşehir, Nevşehir ve Niğde illerinden geçmektedir. Bu önemli adımın sonucunda, toplamda 3.351.317 kg karbondioksit salınımının önlenmesi hedeflenmektedir. Ayrıca, projenin etkisiyle 505 ağacın korunması ve gelecek nesillere sağlıklı bir çevre bırakılması amaçlanmaktadır. Güneş enerjisi ile temiz ve sürdürülebilir enerji üretimine katkı sağlamak adına attığımız bu adım, çevre bilincini artırmak ve enerji sektöründe dönüşümü desteklemek konusundaki kararlılığımızı yansıtmaktadır.

Image hover effect image

İGA İSTANBUL

AIRPORT

Istanbul Airport (IGA), the largest infrastructure project in the history of the Republic, opened its doors on October 29, 2018. As of April 6, 2019, the airport began serving passengers with its first phase, which includes two runways and a terminal building with a capacity of 90 million passengers. Covering an area of 76.5 million square meters, the supply of bitumen for the new airport has been provided by Güven Asfalt.

24/7 Support

Our Offices

Mutlukent Mah. Gökırmak Sok. No:24 Çankaya /ANKARA Azerbaycan Caddesi No:114 Skyland B Blok Kat:29 D:412 Sarıyer / İSTANBUL